i got called in on a rendering job last thursday.
To help a mate out as it was a nice sized job now what im struggling to get my head round is the mix he is useing .
Its on concrete blocks didnt even wet it first the mix is 6:1:1 scrach/6:1:1 top coat ???
now we have scrached 98% of it as the scaffold was in the way along with ha fence too.
toped both the frunt and back wetted the scrach coat and layed it on the used a spat too flaten it in didnt even use a straight edge??
its looking really good
BUT what are the come backs of not wetting the blocks first and using the same mix on both coats??
as i have allwase use a weeker mix top coat (how i was talt too)
To help a mate out as it was a nice sized job now what im struggling to get my head round is the mix he is useing .
Its on concrete blocks didnt even wet it first the mix is 6:1:1 scrach/6:1:1 top coat ???
now we have scrached 98% of it as the scaffold was in the way along with ha fence too.
toped both the frunt and back wetted the scrach coat and layed it on the used a spat too flaten it in didnt even use a straight edge??
its looking really good
BUT what are the come backs of not wetting the blocks first and using the same mix on both coats??
as i have allwase use a weeker mix top coat (how i was talt too)