Hi folks
Am in the process of retiling my bathroom and am looking to fix some of the deeper holes to make level before the new tiles go on.
When removing the tiles over the shower feed and electric supply it has been left like this with the tile across the top. My thought is to add bonding then a light skim for the tile to sit flush on.
Will the plastic water pipe be ok sitting as is in bonding? Or will it sweat and deteriorate the plaster? I guess I could encase it inside a 22mm pipe before the plaster if that is needed?
Thanks for any advice
Am in the process of retiling my bathroom and am looking to fix some of the deeper holes to make level before the new tiles go on.
When removing the tiles over the shower feed and electric supply it has been left like this with the tile across the top. My thought is to add bonding then a light skim for the tile to sit flush on.
Will the plastic water pipe be ok sitting as is in bonding? Or will it sweat and deteriorate the plaster? I guess I could encase it inside a 22mm pipe before the plaster if that is needed?
Thanks for any advice