im a bit slow mate tbh theres approx 25-30m on each wall @ 5-50 per sqm just a tight lick of bonding and skim and ceilings 2-80........would be doing it myself but im flat out with my own work at the monapper83 said:take it theres a mint to be earned on this staircase then spunky ;D ;D