PlasterCraftDundee
Well-Known Member
Out of curiosity what would be your average square meterage per mix be and would you put the same amount on boards as you would a reskim?
Easy 14 bags a day 8-4 on me tod nearly double with a lab like :rolleyes)
Easy 14 bags a day 8-4 on me tod nearly double with a lab like :rolleyes)
Easy 14 bags a day 8-4 on me tod nearly double with a lab like :rolleyes)
Easy 14 bags a day 8-4 on me tod nearly double with a lab like :rolleyes)
Do you wear a cape and have an S on your chest when you do it?
Half bag sets, 1-2 sets a day
= £200 a day daywork :rolleyes)
Have you relocated to that old london town @nissus . sound like city rates
BolloxEasy 14 bags a day 8-4 on me tod nearly double with a lab like :rolleyes)
Easy 14 bags a day 8-4 on me tod nearly double with a lab like :rolleyes)
Ct is on the wind up..
Gullible lot on here, of course he does 280 m a day with a lab...Are we the only ones that noticed the rolling eyes at the end of his post John?
Half bag sets, 1-2 sets a day
= £200 a day daywork :rolleyes)
which bags do you find work best multi or board finishI normally get through14 bags a set but always seem to get through loads of 6 inch nails use two per bag holds them to the wall mint tap with the straight edge flick of water plazzi done :RpS_thumbup:
Board finish are quite good I found the best way to use multi is start at the bottom of the wall and work your way up cause the bags are crap now takes 3 6in nails per bag since they changed them but I just pass the extra cost onto the customer so everyones a winner! Any suggestions on how to stop getting humps in boards? After I nail the adhesive bags to wall having trouble getting boards straight I've tried using coach bolts but there's no coaches parked up around here at min and don't want to buy anyreallywhich bags do you find work best multi or board finish