Jbeesy718
Active Member
Been to look at a job today the lad has had a chimney breast built in breeze block to house a cassette style wood burner the brickie must be blind or a cowboy or both it's up to 40mm out at the top (big step back aswell not even subtle!!) I'm goin to do it s&c then skim but worried I will get cracking/shrinkage at the top having to build these areas out
So should I dub out and scratch day one top next day and skim the day after or should I leave it longer between coats??
So should I dub out and scratch day one top next day and skim the day after or should I leave it longer between coats??