big ceiling

Status
Not open for further replies.
How easy does that look. Is he flattening off or trowelling up on the vid. Just priced them up £100 for 18" one with pole so not cheap mite get one instead of the stilts I promised myself.
 
Got a 130m ceiling on monday not lookin forward to it there are gonna 3 spreads on it and its a house, biggest ceiling ive seen on a house.
 
flynnyman said:
Got a 130m ceiling on monday not lookin forward to it there are gonna 3 spreads on it and its a house, biggest ceiling ive seen on a house.

F*ck me stiff thats like a tennis court.

Bet the lad who owns that house aint a plasterer
 
nelly said:
flynnyman said:
Got a 130m ceiling on monday not lookin forward to it there are gonna 3 spreads on it and its a house, biggest ceiling ive seen on a house.

F*ck me stiff thats like a tennis court.

Bet the lad who owns that house aint a plasterer

No he has married the daughter of a multie millionaire who is building it for them as a wedding present.
 
No he has married the daughter of a multie millionaire who is building it for them as a wedding present.
[/quote]

How much you charging? about £800
 
nelly said:
No he has married the daughter of a multie millionaire who is building it for them as a wedding present.

How much you charging? about £800
[/quote]

per man. then they are using that new special plaster 'thistle board finish' thats about £20 a bag ::)
 
nelly said:
No he has married the daughter of a multie millionaire who is building it for them as a wedding present.

How much you charging? about £800
[/quote]

Im on a price workin for another spread :(
 
I was thiinking

3 lads at £150 = 450
2 labs at £60 = 120

15 bags of gear + scrim 75

equals 645 then £155 on top for stress and shoulder ache :)
 
nelly said:
I was thiinking

3 lads at £150 = 450
2 labs at £60 = 120

15 bags of gear + scrim 75

equals 645 then £155 on top for stress and shoulder ache :)

Im skimmin the rest of the house on price the other lads are cards in, he wants the ceilin done in one.
 
did a ceiling like that with 3 of us on stilts with a time served lab going like the clappers.....we were fighting over the gear.......tape n joint comes into its own in them situations though
 
flynnyman said:
nelly said:
No he has married the daughter of a multie millionaire who is building it for them as a wedding present.

How much you charging? about £800

Im on a price workin for another spread :(
[/quote]

Not Sir Steve Rendersystems ??
::)
 
goody said:
did a ceiling like that with 3 of us on stilts with a time served lab going like the clappers.....we were fighting over the gear.......tape n joint comes into its own in them situations though

Gonna set up 3 or 4 board and stands and we will all be on stilts but im still not lookin forward to it.
 
:o May the force be with you!!!Did kitchen near on 60m2 kitchen island set up in the middle pipes sticking up,nice!!mate turned out not too steady on stilts so more stress,lab chucked such a sloppy mix on the board half way through it was running off so back in buckets again!twerp!!and other trades wandering through leaving doors open. No one died but it was close!!
 
Gonna set up 3 or 4 board and stands and we will all be on stilts but im still not lookin forward to it.
[/quote]

Sounds like your losing sleep over it already :'(

As long as you just let the Labs on the first coat only, 3 of you should be able to roll it out no problem, good luck though!

And set a camera or two up..............you'll get loads of big ceiling work off it - heh heh ;D ;D
 
We have done a few big ceilings there a bit daunting but some what satisfying when there finished. The worst one i saw was well over a 1000m2 on a conference center in marlow i didnt do it but the blokle we were working for did it in sections and they painted it in silk we spent a few weeks aimesing it. :(
 
3 of us and a lab did a 120m ceiling in a restaraunt last year, 3.4m high.
It was fireline board so we pva'd it 1st. We had 3 sections
of dodgy scaffold between us which we had to keep moving. We were
all sh1tt1n ourselves before we started but in the end it worked
out quite easy. I wouldnt do it on a monday morning tho ;)
 
irish_spread said:
3 of us and a lab did a 120m ceiling in a restaraunt last year, 3.4m high.
It was fireline board so we pva'd it 1st. We had 3 sections
of dodgy scaffold between us which we had to keep moving. We were
all sh1tt1n ourselves before we started but in the end it worked
out quite easy. I wouldnt do it on a monday morning tho ;)
Yeah.............5 of them, at least 2 of them will be rough with drink :D
 
bubbles65 said:
irish_spread said:
spunky said:
why are you pvaing firecheck board ?

Fireline sucks in quicker than normal p/b ;)

I've never noticed that before.....

? Plastering 25 yrs and you didnt know fireline (red) boards
pull in massively quicker ? They do mate which is grand on a
small ceiling when u wanna get home early but.......
 
Honestly , I've never noticed before - not that I'm using them on a daily basis, but I'm gonna check it out for future use.....If it saves me time it makes me money ;)
 