Bungalows

Djr

Well-Known Member
Picked up a nice little cash job for a decent builder. Thought there was none of them left out there
 

Attachments

  • 20190905_095426.jpg
    20190905_095426.jpg
    1.7 MB · Views: 173
  • 20190905_095928.jpg
    20190905_095928.jpg
    910.6 KB · Views: 185
  • 20190905_074559.jpg
    20190905_074559.jpg
    2.3 MB · Views: 175
  • 20190905_074615.jpg
    20190905_074615.jpg
    2.2 MB · Views: 178
You’re right about shite builders. Last 2 bungalows I’ve done were a joke. I quoted this one prior to the conversion, mr builder who was doing the conversion priced the plastering too so no need for me. Fair nuff.

Phone rings 3 months later. Can you back over please and look at the plastering. Long story short I re-skimmed the entire property pretty much. Mr builder f**k*d the plastering up. He also f**k*d the conversion up but I didn’t mention that.

0C6940A7-34E9-4BC6-92FA-24389BE19AA7.jpeg
A9FFFB12-7A33-4AF4-9BBD-630F4AE7B80F.jpeg
4ADC70CD-6FE7-412A-A0E8-818E660D3066.jpeg
28FE069D-7AF7-4C64-8BE3-4E7F7CAA612D.jpeg


then this one. Unrelated. Mr builder said it’s ready for ‘skimming’ and flooring lol. Had to sort all his shitty boarding out . Plaster. Even ended up doing floors. Turned into a big job but money was right.

F28F1F96-12E6-4D55-8E41-CABC6771C981.jpeg
5ECA3CAA-F3A7-495C-BB99-795FB5D84A5B.jpeg
D795BB92-6006-46CC-B30E-F260425056F7.jpeg
F92C9FD0-73D7-4DAE-AD3F-082FF243F3BA.jpeg
938A9919-E85A-48C8-8585-905709F2DF54.jpeg
9C575B07-CCAA-4C6B-9945-3B86F1EEFD9D.jpeg
 
You’re right about shite builders. Last 2 bungalows I’ve done were a joke. I quoted this one prior to the conversion, mr builder who was doing the conversion priced the plastering too so no need for me. Fair nuff.

Phone rings 3 months later. Can you back over please and look at the plastering. Long story short I re-skimmed the entire property pretty much. Mr builder f**k*d the plastering up. He also f**k*d the conversion up but I didn’t mention that.

View attachment 39233View attachment 39234View attachment 39235View attachment 39236

then this one. Unrelated. Mr builder said it’s ready for ‘skimming’ and flooring lol. Had to sort all his shitty boarding out . Plaster. Even ended up doing floors. Turned into a big job but money was right.

View attachment 39237View attachment 39238View attachment 39239View attachment 39240View attachment 39241View attachment 39242

nice...

you need to pick and choose your builders
 
Top