Casper posts he’s work !!!!

Colin 879

Well-Known Member
And everyone slags him off , now let’s post our recent work and have peop

here’s Krend job just finished, bird wasn’t happy with the colour when done first panel lol , even though she picked it and I told her cream was like this and not a white looking cream but she loves it now she’s got her head round it.

how can you have 10k worth of rendering done ans not be sure of the colour you want lol
Casper posts he’s work !!!!
Casper posts he’s work !!!!
Casper posts he’s work !!!!
 
And everyone slags him off , now let’s post our recent work and have peop

here’s Krend job just finished, bird wasn’t happy with the colour when done first panel lol , even though she picked it and I told her cream was like this and not a white looking cream but she loves it now she’s got her head round it.

how can you have 10k worth of rendering done ans not be sure of the colour you want lolView attachment 54873View attachment 54874View attachment 54875
Looks like a even cheaper council house now imo with that colour nice work but shite also :LOL:
 
I've taken up cake making!! Did one to celebrate the birth of my mates first born!!
His misses wasn't keen miserable cow!!
 

Attachments

  • Casper posts he’s work !!!!
    Screenshot_20201022-222113.png
    1.4 MB · Views: 164
I.ve been boarding two night mare dormas. Joinery was horrendous. Chucked towel in and grouted half if joints. By some miracle it wi look good skimmed. Dont think I got any pics of the before
 
Just a patch up and reskim of a full dining room today nice and straight forward,and back home for 1 oclock to have some san Miguel watch abit of porn and have a five knuckle shuffle
 

Attachments

  • Casper posts he’s work !!!!
    20200215_164042.jpg
    1 MB · Views: 180
  • Casper posts he’s work !!!!
    20200215_164047.jpg
    821.4 KB · Views: 189
  • Casper posts he’s work !!!!
    20201023_223254.jpg
    1.3 MB · Views: 194
But you started it the day before did you not?
No I was there at half 7 sheeted up,knocked up a full bag of bonding60 to do the chases and round the sockets level out the lower half of the fire place as the customer dabbed it and wasn't the greatest,at 8.45 I knocked up 2 and a half bags of board and put on 3 of the walls troweled up for 11 o'clock the last wall which was the window wall was done by 12.15 as used dirty water for the second mix packed up by half 12 and gone
 
No I was there at half 7 sheeted up,knocked up a full bag of bonding60 to do the chases and round the sockets level out the lower half of the fire place as the customer dabbed it and wasn't the greatest,at 8.45 I knocked up 2 and a half bags of board and put on 3 of the walls troweled up for 11 o'clock the last wall which was the window wall was done by 12.15 as used dirty water for the second mix packed up by half 12 and gone
Nice.
 
And everyone slags him off , now let’s post our recent work and have peop

here’s Krend job just finished, bird wasn’t happy with the colour when done first panel lol , even though she picked it and I told her cream was like this and not a white looking cream but she loves it now she’s got her head round it.

how can you have 10k worth of rendering done ans not be sure of the colour you want lolView attachment 54873View attachment 54874View attachment 54875
Looks nice, but why hasn't the correct upstand on the lead been maintained? Not saying it's your fault.
 
Wasn't gonna bother but as you mention it the jobs 2 completely different colours next date and same day scratching back on same job,
f*** knows what's going on with the expansion beads,
 
No I was there at half 7 sheeted up,knocked up a full bag of bonding60 to do the chases and round the sockets level out the lower half of the fire place as the customer dabbed it and wasn't the greatest,at 8.45 I knocked up 2 and a half bags of board and put on 3 of the walls troweled up for 11 o'clock the last wall which was the window wall was done by 12.15 as used dirty water for the second mix packed up by half 12 and gone

So 1 coated then
 
No I was there at half 7 sheeted up,knocked up a full bag of bonding60 to do the chases and round the sockets level out the lower half of the fire place as the customer dabbed it and wasn't the greatest,at 8.45 I knocked up 2 and a half bags of board and put on 3 of the walls troweled up for 11 o'clock the last wall which was the window wall was done by 12.15 as used dirty water for the second mix packed up by half 12 and gone
I must be an old cart horse then , cos that’s all day for me :oops:
 
Back
Top