One thing that's always interested me is plaster setting times.Had a few strange setting times myself when I been on jobs and like most of you I would presume if you got a heater on the van would bang it on to try speed setting up or if I thought some ventilation was needed would open some windows etc .I read yesterday a dude say he had a 5 hour set time with some out of date unifinish and thought straight away he must of used pva before using it which I have done before and had a 4 hour set time on 2 bags and a laying on bag set.But my point is not uni I seen a couple of dudes on here say they have had 4 -5 hour set times with multi and board and knauff ..all plasters with or without addition additives.
If you have had long crazy set times (I talking 4 plus hours) thought it would be a good thread if you could share what it was you used, how many bags, how long and why you thought it was.?
Probably it will go off topic within one page but if it don't
Thanks
 
we did a set yesterday was 5 hours using multi finish lad at work today did a ceiling 110m2 on his own started at 8 finished at 1 and went home fair play @s61
 
Hi guys,
One thing that's always interested me is plaster setting times.Had a few strange setting times myself when I been on jobs and like most of you I would presume if you got a heater on the van would bang it on to try speed setting up or if I thought some ventilation was needed would open some windows etc .I read yesterday a dude say he had a 5 hour set time with some out of date unifinish and thought straight away he must of used pva before using it which I have done before and had a 4 hour set time on 2 bags and a laying on bag set.But my point is not uni I seen a couple of dudes on here say they have had 4 -5 hour set times with multi and board and knauff ..all plasters with or without addition additives.
If you have had long crazy set times (I talking 4 plus hours) thought it would be a good thread if you could share what it was you used, how many bags, how long and why you thought it was.?
Probably it will go off topic within one page but if it don't
Thanks
How did your meeting go with BG yesterday?
 
@ Plasterman I had a 5 hr set with uni straight on to paint did my feckin swede in but on the upside you had stitches in your forehead a gotee and a reefer in your mouth once I updated the leaflet [emoji1]


Sent from my iPhone using Tapatalk
 
@ Plasterman I had a 5 hr set with uni straight on to paint did my feckin swede in but on the upside you had stitches in your forehead a gotee and a reefer in your mouth once I updated the leaflet [emoji1]


Sent from my iPhone using Tapatalk
Thanks I remember you said that time is what I talking about why do think though was it normal room temperature in there or what?

Thanks for the face upgrade,lol
 
Thanks I remember you said that time this is what I talking about why do think though was it normal room temperature in there or what?

Thanks for the face upgrade,lol
[emoji1] normal temp in house following day pva n multi went off normal on same paint same size ceilings , don't get me wrong uni is like cream to spread but it's got a mind of its own as used it on a wall in same house and it went bang on me within 2 mins had to coat it 3 times to get it back . But a few years back I was using limelite put it on at 8am went home at 4 troweled it the day after and was still pulling fat off it work that one out


Sent from my iPhone using Tapatalk
 
the trouble is that every set is different... different back grounds etc.. hard to do a definitive test :-(
 