Dissatisfied "potential" customer

Status
Not open for further replies.

Casper

Private Member
Got a call today from a posh lady to price some patching work in her house. So i tell her i'll be over when i'm finished my days work at 4-4.30 and she says fine!! 10 minutes later she rings back and ask me if i can go any sooner as the plastering is holding up the decorator :'( ::) So i say, i'll do my best and she then says, i'm going out at 3.45 so you need to be here by then or leave til 4.30. I eventually made it at 4.30 and her flat is 4 up (plenty of stairs) She opens the door and i'm almost gasping for breath and i tell her, jokingly, that was hard after a days plastering and she says...Why, what time did you start? and i say 7.30 and she says...that's nothing i started at 5! ::)

So off we merrily skip to look at her job. Theres various patches of bonding work, quite a few beads, filling a few holes where spots have been etc. So i tell her, yes, you estimate of 2 days is about right and my price is £370. HER FACE= :o :o :o MINE= ::) so she says how much is plaster? I KNOW it's cheap AND how much do you charge per day? I say £150 minimum and there's a lot of work in her "patching" THEN she tells me she has a great team of tradesmen all happily working for £90 per day!!! MY FACE= ;D ;D ;D Exit stage left. Ciao bella :-*
 
I went to price a job this morning in a town that was about 20 miles away. The guy wanted 6 walls skimmed inside and outside an office and there was 6 windows that needed beaded and skimmed.
He reckoned a day would do the lot and I said it would take 2 days and quoted him £260. He said you have quoted me for 3 days as plasterers work for £80 a day >:( Feckin chancer.
 
SLIPPY said:
I went to price a job this morning in a town that was about 20 miles away. The guy wanted 6 walls skimmed inside and outside an office and there was 6 windows that needed beaded and skimmed.
He reckoned a day would do the lot and I said it would take 2 days and quoted him £260. He said you have quoted me for 3 days as plasterers work for £80 a day >:( (french word)in chancer.

So when are you starting it? ;D
 
SLIPPY said:
I went to price a job this morning in a town that was about 20 miles away. The guy wanted 6 walls skimmed inside and outside an office and there was 6 windows that needed beaded and skimmed.
He reckoned a day would do the lot and I said it would take 2 days and quoted him £260. He said you have quoted me for 3 days as plasterers work for £80 a day >:( (french word)in chancer.
what we charge per day is our business. When you give a price then thats the price. They should just either accept or decline. F*****g pricks
 
You could always come to Glasgow and work for £180 for 2 days and buy some cheap bags of dust and carry it all up 4 floors!! ;D
 
Exactly Bruce. WE are not in this trade to p!ss about and let people dictate how much we should be earning. It's Business, supply on demand. End of ;)
 
uck em all there all unts i dont work by the day [cause it takes me 2 days to do a ceiling /large bathroom one mind] just price work ;D
 
i dont do domestic anymore feck that even for 150 a day 200 a day more like it pays for all the farting around
 
goody said:
casper you have a comedic touch there with words mate lol

Aye? you should have been with me when i left her door and made my way down 4 floors. Pure comedy, Billy Connolly didn't have a look-in ::)

I hope the stuck-up bitch is reading this!! lol
 
I hate the way people do that, its like there saying ' you, a mere plasterer want 150 pounds for your days wage' as if you dont deserve it because your only worth 90 pounds. she prob earns 140 a day and thinks you are below her in the pecking order so she aint gonna pay it pal.
 
plasterjfe said:
I hate the way people do that, its like there saying ' you, a mere plasterer want 150 pounds for your days wage' as if you dont deserve it because your only worth 90 pounds. she prob earns 140 a day and thinks you are below her in the pecking order so she aint gonna pay it pal.


She had the audacity to tell me that she would hang onto my card for the future. I felt like foking grabbing it off her and telling her not to touch what she can't afford!!! >:(
 
Casper said:
plasterjfe said:
I hate the way people do that, its like there saying ' you, a mere plasterer want 150 pounds for your days wage' as if you dont deserve it because your only worth 90 pounds. she prob earns 140 a day and thinks you are below her in the pecking order so she aint gonna pay it pal.

She had the audacity to tell me that she would hang onto my card for the future. I felt like foking grabbing it off her and telling her not to touch what she can't afford!!! >:(

Thats exactly how i play it with people like that challenge the ide that they are mere paupers actually below you in the pecking order and they cant actually afford you. they soon want the work done they cant face being cheapend by a dirty chippy arse with plaster dust in his hair
 
why do you tell people your day rate ? its no ones business but your own. give an estimate for the complete job labour and materials and leave it at that.
 
owls said:
why do you tell people your day rate ? its no ones business but your own. give an estimate for the complete job labour and materials and leave it at that.


EXACTLY

Im doin some work for 2 builders who have set up shop ive done few jobs and they have underpriced one of them and are upset that i got paid more than them, now they are sayin they want to always earn more than me so i told them to put their F*****g prices up lol

Im goin to price a job tomorrow for them they will get the price and when he askes how long i will be telling him have i got the job or not? Coz he will do the maths and work out the day rate and i cant be arsed adding on extra to be knocked down or sayin it will take two extra days longer than he thinks, a price is a price.
 
when my van goes in for repair i pay£50 per hr and that is cheap compared to main dealer prices,when my boiler breaks down i pay a gas enginer £75 call out and £45 pr hour there after.when i go down the whore house i pay £40 for a BJ and they think £150 a day is steep for a hard days skimming ???
Tel them to do it them selves !!!!!!!!
Wankres
 
£40 for a BJ :o it's only £20 for a shag by me ;D, so I was told anyway......by errr someone ::)
 
flynnyman said:
EXACTLY

Im doin some work for 2 builders who have set up shop ive done few jobs and they have underpriced one of them and are upset that i got paid more than them, now they are sayin they want to always earn more than me so i told them to put their (french word)in prices up lol

Im goin to price a job tomorrow for them they will get the price and when he askes how long i will be telling him have i got the job or not? Coz he will do the maths and work out the day rate and i cant be arsed adding on extra to be knocked down or sayin it will take two extra days longer than he thinks, a price is a price.

Ten quid says they f*ck you off fairly soon, get someone cheaper in, then are back on the phone later in the year.

I get this ALL the time with builders and conservatory installers especially.

I've learnt to not give a flying f*ck about builders, they are only loyal to their wallet.
 
nelly said:
flynnyman said:
EXACTLY

Im doin some work for 2 builders who have set up shop ive done few jobs and they have underpriced one of them and are upset that i got paid more than them, now they are sayin they want to always earn more than me so i told them to put their (french word)in prices up lol

Im goin to price a job tomorrow for them they will get the price and when he askes how long i will be telling him have i got the job or not? Coz he will do the maths and work out the day rate and i cant be arsed adding on extra to be knocked down or sayin it will take two extra days longer than he thinks, a price is a price.

Ten quid says they f*ck you off fairly soon, get someone cheaper in, then are back on the phone later in the year.

I get this ALL the time with builders and conservatory installers especially.

I've learnt to not give a flying f*ck about builders, they are only loyal to their wallet.


just saved myself a tenner lol yeh they got a price for half and he is gonna do it in half the time lol
 
So not are they underpricing the building works but the plastering as well, they'll be outa business soon, can you post there phone number cos I need some new power tools. Hopefully they'll underprice them too.

When I first started out iwas working for a butsh and sundance builders. I was on a day rate of £65 a day. Used to drag a day into two. Would of been cheaper to get someone in who new what they were doing, which they never susted out.
 
flynnyman said:
just saved myself a tenner lol yeh they got a price for half and he is gonna do it in half the time lol

Which means they are paying the exact amount as they were paying you per day!


And to do it twice as fast means the quality wont be as good..............they will probably be back on the phone before the end of that job.

When they do phone back (and at some point they deffinately will) tell them you have doubled your prices as you can only be @rsed going at half the speed <----- They'll enjoy that :)
 
Status
Not open for further replies.
Back
Top