As soon as that gets mentioned you know your dealing with a tight arseIf anyone mentioned have you knocked openings off .
You would never see me again ....
Tell builders me all windows doors know matter the size had a few complain with bi folds but still measured throughAlways measure through openings! Even bi-folds @John j
Takes as long to go round em then straight across so shouldn't be taken out. Specially if cills are on
Bi folds are the worst of the lot. Pain to stick the heads and the face over the steels and spend time and money covering them up.Tell builders me all windows doors know matter the size had a few complain with bi folds but still measured through
Big bays with cills on. Seem to take a age to skim roundBi folds are the worst of the lot. Pain to stick the heads and the face over the steels and spend time and money covering them up.
Definitely sound a right back to frontAs soon as that gets mentioned you know your dealing with a tight arse
are you an engineer or teacher or firemanI am having my dry lined house skimmed on a £ per sq meter rate,should I be paying sq meter rate for for internal doorways .I understand paying for external doorways and windows as there's beading and reveals to do but there's nothing to do to internal doorways. Thanks
If he were a fireman one of his shift will be doing it in their rest days.are you an engineer or teacher or fireman
Bricklayer and I don't charge for doorways.are you an engineer or teacher or fireman
Depends if she’s transgender!most spreads go on the basis
if you let me ride your sister
you can take the doors out
I have a solution. Tell your spread that it upsets you having to pay for doorways and could he please take these out of the measure and just up his SQM rate to allow for them.Bricklayer and I don't charge for doorways.
I hope you’re not a joiner, doing yourself out of pocket.Bricklayer and I don't charge for doorways.
Well you should. Surely it takes longer to cut your blocks to make a doorway, and put a lintel on, than build straight through?Bricklayer and I don't charge for doorways.
Are you trying to reason with a brickie Tony? Thought you had more sense.Well you should. Surely it takes longer to cut your blocks to make a doorway, and put a lintel on, than build straight through?
He builds straight through and puts lintel on then cuts doorway outWell you should. Surely it takes longer to cut your blocks to make a doorway, and put a lintel on, than build straight through?
Have you knocked openings off?If anyone mentioned have you knocked openings off .
You would never see me again ....