Disco driver
New Member
Hi everyone I am not a plasterer & this is my first attempt at dot & dabbing
I am in the process of renovating our bathroom. I have removed all old tiles & plasterboard & have reboarded the stud walls. I have also removed all old adhesive from breeze block walls. Should I seal the breeze block with SBR first if so how would I do this.also we will be tiling over the plasterboard so should I have to tape the joints. I will also be tanking the shower area. Any tips or help would be greatly received thanks in advance
I am in the process of renovating our bathroom. I have removed all old tiles & plasterboard & have reboarded the stud walls. I have also removed all old adhesive from breeze block walls. Should I seal the breeze block with SBR first if so how would I do this.also we will be tiling over the plasterboard so should I have to tape the joints. I will also be tanking the shower area. Any tips or help would be greatly received thanks in advance