Morning all, I'm looking for a little advice on estimating quantities
As the title says...
I've landed myself a big job in switzerland starting in a little over a month. I am shipping the multi finish over in a container (can't get it or anything like it over there and the customer wants it).
The difficulty estimating lies with the surface of the walls and ceilings, they are of a textured finish (called crepe over there) and the fact they are paying £4000 to have plaster shipped over so underestimation is a no no lol.
It's easy enough to estimate on a few artex ceilings but quite stressful over 2400m2 and no room for error given the logistics of it all.
Over boarding isn't an option for them due to time constraints/labour costs, and bonding, it just adds time and effort, (and space in the container) so I was just gonna skim over it all like I do with artex (even quite deep artex) and I get a good finish
So what do you lads think I'll get coverage per bag given the surface?
I reckon maybe 5-7 m2 per bag
I can over order but I don't want to massively over order (like 2 pallets)
I've got all the figures that I think are right but It's good to have some advice from some other experienced heads (20 years myself)
Many thanks in advice
It's the best pic I have of the surface but you get the idea!
As the title says...
I've landed myself a big job in switzerland starting in a little over a month. I am shipping the multi finish over in a container (can't get it or anything like it over there and the customer wants it).
The difficulty estimating lies with the surface of the walls and ceilings, they are of a textured finish (called crepe over there) and the fact they are paying £4000 to have plaster shipped over so underestimation is a no no lol.
It's easy enough to estimate on a few artex ceilings but quite stressful over 2400m2 and no room for error given the logistics of it all.
Over boarding isn't an option for them due to time constraints/labour costs, and bonding, it just adds time and effort, (and space in the container) so I was just gonna skim over it all like I do with artex (even quite deep artex) and I get a good finish
So what do you lads think I'll get coverage per bag given the surface?
I reckon maybe 5-7 m2 per bag
I can over order but I don't want to massively over order (like 2 pallets)
I've got all the figures that I think are right but It's good to have some advice from some other experienced heads (20 years myself)
Many thanks in advice
It's the best pic I have of the surface but you get the idea!