So what time am I looking from start to finish if a do 1 bags ish first coat on board in a nice aired room then second coat .
 
Just looked at it . 15 quid for 5 sachets to knock 60 mins of. But it's 2 sachets a bag .
 
Why just don’t do another wall at the same time and make some extra money and save some money at the same time? I have used it this summer and after 5 sachets stopped using it. It fucks with the plaster as well.
 
Why just don’t do another wall at the same time and make some extra money and save some money at the same time? I have used it this summer and after 5 sachets stopped using it. It fucks with the plaster as well.
My thoughts exactly. Could understand it for first coat on a small job.
 