D
Deleted member 29624
Guest
Skimming an artex hallway today and thought I'd put a half time in the second coat so it didn't hang around to much was over zombie mix was an absolute dream to finish was effortless on both sets. Left an hour between first and second coat ( was a deep pattern so wanted it pull in a fair bit) and sets were done in 2.30....anyone else do this....not so much the time but how easily it finished. If it makes the gear so much nicer I'm almost considering sticking one in every top coat, gain 30 mins and have a less sore elbow and customer can pay for it