Hi, its tidy concrete block walls.im just looking for rough idea to how much material other boys might use and work out a happy medium for the client to order, I was thinking 2 possibly 3 ton sand, 35 bag of cement an 30 bag of chip (hitting at 4m2 to bag) as but will prob just get a bulk bag. Anyone else think that sounds about right