Went to start a job today new build which I'm doing in krend I'm using 15mm beads ,started first g
able and as soon as I got to the first weep hole-vent I new I had a problem it was sticking out 5mm as cemented solid next was 20mm and so on is .is it to much trouble for them to either leave them all the same at a decent depth or just bloody leave them loose and the spred will sort it out .but mind you most brickies don't have any brains anyway .
able and as soon as I got to the first weep hole-vent I new I had a problem it was sticking out 5mm as cemented solid next was 20mm and so on is .is it to much trouble for them to either leave them all the same at a decent depth or just bloody leave them loose and the spred will sort it out .but mind you most brickies don't have any brains anyway .