Got a friend who wants his industrial building, partitioning and turning into an office space.. It is half breeze block at bottom of wall and the industrial steel cladding at top half of wall (see pic below);
im wondering anyone got any suggestions on how best to fix boards too it ?
I was thinking of fixing some 3"x2" wood to the top half of the wall on the cladding, and dot the bottom of the wall with some gypsum bonding compound, and just dropping an 8x4 over the lot as i go along. Shoot screws into the top half into the 3"x2" and tap back the boards at bottom to level.
But not sure how best to fix the 3"x2" to the cladding though, what screws or plugs should be used or what is best practice ?
Any and all ideas welcome.
Also he wants insulation boards to help insulate the room.
,
im wondering anyone got any suggestions on how best to fix boards too it ?
I was thinking of fixing some 3"x2" wood to the top half of the wall on the cladding, and dot the bottom of the wall with some gypsum bonding compound, and just dropping an 8x4 over the lot as i go along. Shoot screws into the top half into the 3"x2" and tap back the boards at bottom to level.
But not sure how best to fix the 3"x2" to the cladding though, what screws or plugs should be used or what is best practice ?
Any and all ideas welcome.
Also he wants insulation boards to help insulate the room.
,