phippsy333 said:here we go gents....this is the way to plaster sorry if you think im being big headed, ( i am but im f**k**g good so i can be)........1st coat approx 2mm thick lay on as smooth as poss, get a trimmed up pointy 1inch brush and paint out corners, then flatern 1st coat, lay second coat approx 1mm thick, get same 1inch brush wet and brush in corners , flattern down , wet trowel only minimum water as it will dull work only use enough to lubricate trowel, then use a 90 internal trowel ( twitcher) on corners, then wait a while ( depending on time of year ) probably around10 to 15 miuns before dry trowel and again if neccesary get a bit of muck on tip of twitcher and wipe down edges again, if u have to do this make sure you dry trowel out corners. If u use a twitcher prperly you can hit bigger hits instead of opposite hits which are slower and limiting. If i use a 2 man team we can hit 2 coats on an average room 12 by 12 dry trowel the lot by 11 to 123 oclock and start on next room ...no bullshit....this is the way to plaster consistantly with a finish that is second to non....on any background surface
if your not laying on board and only old plaster etc then pva 3 to 1 mix to seal then 4 to 1 for a tack coat once seal coat is dry..if on artex then a good seal or maybe a few..........but if on polycell paints overboard and to be honest you should realy on artex too ....but...
This is the word and believe in it gents......cause their words of wisdom...told u i was big headed...but i can hit 100m in a day on me jack jones ....again no s**t www.jpplasterers.com
phippsy333 said:here we go gents....this is the way to plaster sorry if you think im being big headed, ( i am but im f**k**g good so i can be)........1st coat approx 2mm thick lay on as smooth as poss, get a trimmed up pointy 1inch brush and paint out corners, then flatern 1st coat, lay second coat approx 1mm thick, get same 1inch brush wet and brush in corners , flattern down , wet trowel only minimum water as it will dull work only use enough to lubricate trowel, then use a 90 internal trowel ( twitcher) on corners, then wait a while ( depending on time of year ) probably around10 to 15 miuns before dry trowel and again if neccesary get a bit of muck on tip of twitcher and wipe down edges again, if u have to do this make sure you dry trowel out corners. If u use a twitcher prperly you can hit bigger hits instead of opposite hits which are slower and limiting. If i use a 2 man team we can hit 2 coats on an average room 12 by 12 dry trowel the lot by 11 to 123 oclock and start on next room ...no bullshit....this is the way to plaster consistantly with a finish that is second to non....on any background surface
if your not laying on board and only old plaster etc then pva 3 to 1 mix to seal then 4 to 1 for a tack coat once seal coat is dry..if on artex then a good seal or maybe a few..........but if on polycell paints overboard and to be honest you should realy on artex too ....but...
This is the word and believe in it gents......cause their words of wisdom...told u i was big headed...but i can hit 100m in a day on me jack jones ....again no s**t www.jpplasterers.com
phippsy333 said:yep mate why? this was answer to other not u about 1coat plastering