Day work .Hi guys,
Got a job of 2000 m2, tacking then skimming a new build timber frame. Labour only.
What's a good rate to go in at?
If you are doing this day in day out you'd know the price.Hi guys,
Got a job of 2000 m2, tacking then skimming a new build timber frame. Labour only.
What's a good rate to go in at?
£10/&11Hi guys,
Got a job of 2000 m2, tacking then skimming a new build timber frame. Labour only.
What's a good rate to go in at?
£10/&11
Stick to your nicotine stained skanky artex ceilings bean headStick to being a bucket bitch kid
Is that a new build house fuk me if it is must be a big b*****d
Board on day rate / plastering on price.Hi guys,
Got a job of 2000 m2, tacking then skimming a new build timber frame. Labour only.
What's a good rate to go in at?
9 out of 10 yes are around 2.3 2.4 very rare there any higherWas thinking that. 2.3m max on new build enit? Think he means new as in not new lol
2.4 on new builds is standard but have done 2.5 2.6 2.7 2.9 and 3.0 so your info is shiteWas thinking that. 2.3m max on new build enit? Think he means new as in not new lol
2.4 on new builds is standard but have done 2.5 2.6 2.7 2.9 and 3.0 so your info is shite
Very nice need a hand lolYes it's a monster, 1st floor is vaulted ceilings! I'm thinking £6-£7 mtr skim? It's a one off build in Somerset.
Meant metric you should have pulled me on that balloon headSo was I 2.5 is metres you still work in inches cause you can't read a tape measure in imperial football head
Meant metric you should have pulled me on that balloon head
Yes it's a monster, 1st floor is vaulted ceilings! I'm thinking £6-£7 mtr skim? It's a one off build in Somerset.
£6/7 on standard height and Chuck a few more on for the vaulted stuff plus when boarding the vaulted ceilings you can guarantee the t**t head Architec has spec insulated board so Allow a bit more for that as well bud.sounds like a nice jobYes it's a monster, 1st floor is vaulted ceilings! I'm thinking £6-£7 mtr skim? It's a one off build in Somerset.
£6/7 on standard height and Chuck a few more on for the vaulted stuff plus when boarding the vaulted ceilings you can guarantee the t**t head Architec has spec insulated board so Allow a bit more for that as well bud.sounds like a nice job
I was I’ll take that result! LolI know we can't have everything .Anyway why aren't you watching the game