out of 13 full weeks on present job

Status
Not open for further replies.
just under 5 weeks have actually been skimming.shows how important prepping and getting it to a skimming stage is.

the thing is though all the herberts on the job aint got a fcuking clue what it takes
 
I must've spent nearly 10 days beading a job with 180m in it it was full of windows but surprising how long things take plus the bloke we were doing it for has loads of work on ......scary though if you get 10 perm for mono you have to go like **** unless you want to be on site til 6
 
I have just had 2 days of it in a school some t**t dabbed the boards not a leval wall they stuck beads with the
adhesives and never clean then back made good render with the adhesive I fecking hate to see that . Was told gear was coming at 7 30 am cane at 9-35 the class rooom was a s**t heap with gear all over and so the list goes on. And I had to fill a small jug
out of the basin for water and fill the bucket that way, oh well nothing changes same old same old.
 
I have just had 2 days of it in a school some t**t dabbed the boards not a leval wall they stuck beads with the
adhesives and never clean then back made good render with the adhesive I fecking hate to see that . Was told gear was coming at 7 30 am cane at 9-35 the class rooom was a s**t heap with gear all over and so the list goes on. And I had to fill a small jug
out of the basin for water and fill the bucket that way, oh well nothing changes same old same old.

true henry but its always us working thru lunch and breaks struggling away making a silk purse from a pigs ear
 
Status
Not open for further replies.
Back
Top