The_Architect
Member
I've plastered a few walls, part of the lime plaster behind the rad had totally gone so I had to pull away about 1.5m2 of it and bond before skim. The skim is dry, the bonded skim part still not. Once its totally dry I'll mist and paint before hanging the rad.
Once its been painted and the rad connected is there a period of time before I can run the central heating? I've seen somewhere that rads shouldn't be turned on for four weeks after, but is that when pipes are in the plaster? Mine are in the floor so only the rad will produce heat near the wall..
Cheers.
Once its been painted and the rad connected is there a period of time before I can run the central heating? I've seen somewhere that rads shouldn't be turned on for four weeks after, but is that when pipes are in the plaster? Mine are in the floor so only the rad will produce heat near the wall..
Cheers.