Plastering on steroids

Makitas got the same cutter, and they have a different one like a jigsaw with a short flat blade on it
 
Plastering on steroids
 
I'd say he has it marked on the plasterboard first. It's all set up. He did 2 cuts in the video without measuring.
 
Fcking shite..for a start y is he measuring and cutting on that wall with nothing on it just fly the board straight on and cut bk after its screwed up..not impressed me anyway boys
 
Fcking shite..for a start y is he measuring and cutting on that wall with nothing on it just fly the board straight on and cut bk after its screwed up..not impressed me anyway boys

He's faster than u that's y he has the time to do the measurements. He is the man
 
Wen I get a decent phone wen my contract finally ends in a few months Il put a vid up of me on my own screw fixing a room and Il guarantee u clemo it will be quicker than that and Il prob have more fecking sockets to cut out!
 
I want my face blurred tho and company name etc as dont want people knowing who I am on here lol..so Dan will have to do that as I wunt have a clue
 
The bloke that does the tacking for me I've seen him do over 80 boards a day. On his own. And he had to carry them into the house. Tbh he wasn't running around like a lunatic like the bloke in the video. He just has a good system and brain for numbers. I've seen him take 5 to 6 measurements then go do the cuts. I'd forget my name before I get to the plasterboard.
 
The bloke that does the tacking for me I've seen him do over 80 boards a day. On his own. And he had to carry them into the house. Tbh he wasn't running around like a lunatic like the bloke in the video. He just has a good system and brain for numbers. I've seen him take 5 to 6 measurements then go do the cuts. I'd forget my name before I get to the plasterboard.
Everything has to be written down for me these days or I'm a blank
 
Can't like on this thread either....
I'm awful, what's the saying. Measure twice, cut 3 times, f**k it up, and go buy some more!?

Sent from my SM-G930F using Tapatalk
 
The bloke that does the tacking for me I've seen him do over 80 boards a day. On his own. And he had to carry them into the house. Tbh he wasn't running around like a lunatic like the bloke in the video. He just has a good system and brain for numbers. I've seen him take 5 to 6 measurements then go do the cuts. I'd forget my name before I get to the plasterboard.

My motto is measure twice cut once then trim with knife then use surf form and eventually fill the gap with expanding foam! :rayos:
 
Back
Top