nickelarse
Private Member
for internal work, what would u guys prefere to use based on cost, r+s wear and speed. onto either block or brick.
in a silo think its about 170 a cube
You still have to rent a silo and have power. But for schools and the like it would make sense. Bloke who nearly worked me to death when i was learning called me the other day asked me to help him out on a community center, hardwall @3m high 5.00m2, I've got enough on anyway but he's in trouble there and CPI would help him out, the only blokes he can get hold of can skim and that's it, 2+1 spraying in front of them and he might get out of the place in pocket but at present he has a load of wnkers on £100 a shift not performing! Hence the allright mate call.that works out 1.93 a 25kg dollop