Hi guys how do you do? Hope to find a answer to my question hear from all your knowlege,
Hacked old render off a garrage with a kango, the garrage is built into a bank i plan to render it after plugging and tanking it up, my question is its a 2 story garrage about 25foot high ish, bottom half is brick then a concrete slab in the middle that protrudes out about 2 inches before the blockwork carrys on up, its not a straight forward, bead up and go the concret slab is causing a lip on the garrage about 2 inch out, how can i do this as the corners dont mach up ect, treat the 2 walls as seperate and leave the exposed concrete lip or is there any other way to do this?? I will send pics tomorra cheers guys
Hacked old render off a garrage with a kango, the garrage is built into a bank i plan to render it after plugging and tanking it up, my question is its a 2 story garrage about 25foot high ish, bottom half is brick then a concrete slab in the middle that protrudes out about 2 inches before the blockwork carrys on up, its not a straight forward, bead up and go the concret slab is causing a lip on the garrage about 2 inch out, how can i do this as the corners dont mach up ect, treat the 2 walls as seperate and leave the exposed concrete lip or is there any other way to do this?? I will send pics tomorra cheers guys