church
Well-Known Member
Doing a fair sized kitchen extension for a builder at the mo his normal spread which i know is to busy so i got the call , when i got there he pointed out all the low and high spots in the block work which he wants s&c rendered two coat work and set he also wants all the beads nailed ,the plasterboard ceilings floated and set 10mm minimum (bonding ) , anyway is this all a bit strange or is it me ? He does smoke the green fags by the way .
ps its all daywork
ps its all daywork