Hi Chaps,anyone know of any two coat work ,West Yorkshire are.Cheers [email protected]
thats why he wants two coatsWhy my friend ...its f**k**g freezing out there ??
man up !!lol ,been a good week in Kent !Why my friend ...its f**k**g freezing out there ??
Joke isn't it..400m2 of it and 200m2 of skimming ceilings..floating shud be at least £8m2..but if he's happy and can make it pay he's entilted to it if he rings sharpish.I wouldn't ring anyone offering £6m2 for 2 coat work, it's an insult to the skill and effort required. f**k that
Ye its better than sat at home like like u say its £150 a day for 2 men and easy days really he pays for beading but beware he dsnt pay through doors windows etc gud luck anyhowI agree ,but £6.00 m2 is better than sat waiting for the phone to ring, especially in January when works a bit tight .50 m2 a day for two is only 16 bags,then skim easy day for £ 300.00
8 quid is what he'll be charging out, so he's making 2 quid a metre for doing nowt, welcome to the layer cake.Joke isn't it..400m2 of it and 200m2 of skimming ceilings..floating shud be at least £8m2..but if he's happy and can make it pay he's entilted to it if he rings sharpish.
No pays linean meter but it works out fck all on previous jobs we've done we've done a set of reveals with head and its works out about a £5iver! Joke int itTaking out doors and windows off an internal measure is a piss take , Are all the window reveals on day rate then.
And the rest I bet.8 quid is what he'll be charging out, so he's making 2 quid a metre for doing nowt, welcome to the layer cake.
Bet he's getting close to £10And the rest I bet.
I can understand taking doors out, why pay someone for something they've not done, but window reveals should be paid on a linear metre plus beading imo, and what gets me is the main subbies who contract to the main contractor rates them and gets paid for them but doesn't pass this on to the guys on the tools, me personally I used to i pay the lads for it, I got paid for it it keeps the cogs well oiledTaking out doors and windows off an internal measure is a piss take , Are all the window reveals on day rate then.
I can understand taking doors out, why pay someone for something they've not done, but window reveals should be paid on a linear metre plus beading imo, and what gets me is the main subbies who contract to the main contractor rates them and gets paid for them but doesn't pass this on to the guys on the tools, me personally I used to i pay the lads for it, I got paid for it it keeps the cogs well oiled
Let's say someone floats and skims 1 side of a corridor at 2.5 high and 25metres long at say £8m2 with let's say 10 standard size doors so each door is roughly 2m2, that's 62.5m2 in total with doors in the measure that's £500, take the doors out and you've saved yourself £160 on one side of the corridor and the spread has still earned a good crust doing 42.5m2. Now there's the other side of the corridor with the same amount of doors saving you another £160 is there's ten doors each side of the corridor there's 20rooms that your willing to pay through the doors for, that's £640 in total that you've needlessly paid outa measure for doors is a gesture of good will, the percentage of door space to floated areas is minimal.
Exactly that, sometimes I wish we could stop bead around the openings we don't get paid for then let them cut the linings in to suit.Usually have to float out to 20 odd mm with brickies work being out etc wen wrking to door casing wen only getting paid to put on 12mm..the amount of time I've floated 20-25mm and not being paid any extra I've lost count wudnt do it now but took it on chin wen was younger
Sometimes I wish I'd tried harder at schoolExactly that, sometimes I wish we could stop bead around the openings we don't get paid for then let them cut the linings in to suit.