hail hail
Private Member
What would you price this at for 1 man laying with labourer and how long would it take you. All ground floor with ready mixed sand and cement screed. Will be using a dewalt dw088 laser level and laying heavy gague doc roll.
Room1, 3.4 x 4.1m (bedroom)
Room2, 3.4 x 4.1m (living room)
Room3, 1.2x 4.1m (hall)
Room4, 4.1x4.1m (bedroom)
Kitchen, 5.1x3.4m (kitchen/dining)
Room1, 3.4 x 4.1m (bedroom)
Room2, 3.4 x 4.1m (living room)
Room3, 1.2x 4.1m (hall)
Room4, 4.1x4.1m (bedroom)
Kitchen, 5.1x3.4m (kitchen/dining)