Jerseyboy
Active Member
Hello all
I posted previously regarding the G4 machine and maybe getting into liquid screeds.
But after a few conversations regarding the screeds I’ve decided to stick to what I know.
Ocr and bagged render is being used more frequently now instead of sand and cement.
I have a massive house to do internally only which is parmurex with skim finish
So I will need a machine to do this job so just looking for advise on what pump to go for.
When this job is finished most of my work will be small jobs 3-4 houses and small developments
So want something I can get in and out of the van.
Also I can’t use 240v on site
Thanks
I posted previously regarding the G4 machine and maybe getting into liquid screeds.
But after a few conversations regarding the screeds I’ve decided to stick to what I know.
Ocr and bagged render is being used more frequently now instead of sand and cement.
I have a massive house to do internally only which is parmurex with skim finish
So I will need a machine to do this job so just looking for advise on what pump to go for.
When this job is finished most of my work will be small jobs 3-4 houses and small developments
So want something I can get in and out of the van.
Also I can’t use 240v on site
Thanks