I wonder if someone can give me some advice please.
I'm in the process applying paraguard to my gable end and I wish to give it 2 coats
1/ can I apply 2 flood coats to the top half of the gable and finish the bottom at another time. The reason is the scaffolding needs to come down ASAP to allow my drive to be tarmacked
2/ if I am unable to do the top half first I'm unsure whether I could get 2nd flood coat within the 30 minutes has stated by Parex ...is this 30minutes a hard a fast rule ?
The trouble is this bloody weather is against me here.
Finally could someone tell me how long after DPR 1.5mm, would it be fine after 24hrs providing the weather is on my side tomorrow.
Any help/advice here would be gratefully appreciated
I'm in the process applying paraguard to my gable end and I wish to give it 2 coats
1/ can I apply 2 flood coats to the top half of the gable and finish the bottom at another time. The reason is the scaffolding needs to come down ASAP to allow my drive to be tarmacked
2/ if I am unable to do the top half first I'm unsure whether I could get 2nd flood coat within the 30 minutes has stated by Parex ...is this 30minutes a hard a fast rule ?
The trouble is this bloody weather is against me here.
Finally could someone tell me how long after DPR 1.5mm, would it be fine after 24hrs providing the weather is on my side tomorrow.
Any help/advice here would be gratefully appreciated