Stevieo
Royal Spin Doctor
I'm pricing up a bit of a job at the moment and wondering what to charge.
Float and set a corner here. Make good.
Build out and skim two window walls @2.4x3.6 Windows are 2.6x1.8 Replace skirting and sills.
Paint. and generally make good.
Repaint front door gloss black outside and British racing green inside.
Door is standard size with side panels approx 600mm with glass uppers.
Repaint hand rails. They are 1.2 high, approx. 3 floors, so six lifts to cover 3 half landings. Customer specifies British racing green. Hammerite. There are 9 uprights on a lift. Handrail is approx 3inches wide.
Photo of other building's ironworks after the painter had made a mess.
Repaint all flat doors. There are six standard doors with four indented panels. White. To be glossed. Two per floor excepr on the ground floor.
Insulate attic with 300mm knauf rockwool. Entrance to attic is through one of the flats. Attic is 81m2
Wondering what to charge.
Customer has allowed 2 days for remedial plastering works.
4 days for emulsion and skirting.
1 day to do loft.
2 days for ironworks
1 day to do doors
Customer has allowed £620 for materiels....what should I charge? My day rate is £180....please help.
If you fall for this you're a mong.
Float and set a corner here. Make good.
Build out and skim two window walls @2.4x3.6 Windows are 2.6x1.8 Replace skirting and sills.
Paint. and generally make good.
Repaint front door gloss black outside and British racing green inside.
Door is standard size with side panels approx 600mm with glass uppers.
Repaint hand rails. They are 1.2 high, approx. 3 floors, so six lifts to cover 3 half landings. Customer specifies British racing green. Hammerite. There are 9 uprights on a lift. Handrail is approx 3inches wide.
Photo of other building's ironworks after the painter had made a mess.
Repaint all flat doors. There are six standard doors with four indented panels. White. To be glossed. Two per floor excepr on the ground floor.
Insulate attic with 300mm knauf rockwool. Entrance to attic is through one of the flats. Attic is 81m2
Wondering what to charge.
Customer has allowed 2 days for remedial plastering works.
4 days for emulsion and skirting.
1 day to do loft.
2 days for ironworks
1 day to do doors
Customer has allowed £620 for materiels....what should I charge? My day rate is £180....please help.
If you fall for this you're a mong.