I have an outer wall that I have removed pebble dash from. By removing the pebble dash it has caused some of the bricks to become loose/live even though I was being very careful, all by hand. To solve this problem I am going to rake out the joints and re point in 3.5 medium grit Hydraulic Lime Mortar from a company called Conserv. I am repointing with lime as this is what the house was built with. What I need to know is how long does hydraulic lime/mortar take to set?. I intend to render over the brick work again once repointed but only once the lime has set. Any help here would be appreciated. Thanks Adam