thanks for the comments, the job was near northwich ( overdale hall ) we used 107 tonnes for walls and 500m2 lath and plas to ceilings
we used ty-mawr for the materials, and a local joinery firm for the lath 16,000LM we did repair some mouldings but repoduced the majority