peterroberts
Active Member
Doing some refurb work for council, bathrooms, told the plumber when he has the basin and toilet out to shout me and I will get that wall done before he puts the new stuff in, now is that far too complicated for him to understand as the last 6 he has fitted all the new stuff and then I'm expected to plaster around the 1/2 inch gap down the side of the cistern, behind all his pipe work etc etc etc, think tomorrow he may well have a size 10 boot firmly inserted in his rectum,
im not being unfair am I ?
im not being unfair am I ?