Been a long day.

Been a long day.
Been a long day.
Been a long day.
Been a long day.

Job complete, straight through no brew from ufc.
 
@Topspread16 this is not a dig by any means but we put new airbricks in and bring them out so the render finishes flush rather than beading out. Top job though prefer the plinth colour to the top :sisi:
I’d of preferred them flush was old facing brick except the extension. Told customer to leave old ones in till i’d got my levels. Then he could smash them out and fit them to the underside of the belcast. Falls on deaf ears though. Hate when jobs have to go to the floor such a pain. New extensions or builds I have them put facing brick or stone up to damp. Had salts push all the mesh off before was a right mess.
 
Back
Top