Has there ever been a union?
Yes, if a job is shot it's **** regardless of unions,Don't want anything to do with unions. Some sites won't let union guys on cos unions cause more hassle than there worth.
Spot on malc also about the same time 6 month course guys appeared on the scene, frowned upon by all journeymen.in the 60s was the last time i saw a building workers union. if a site was union job you had to have a union card to be able to work on that site. you where paid the union rate which was very low. you also had to pay union subs.
we where on the lump, a lump sum for square yard. no holiday pay ,no sick pay, we negotiated our own rates. with the huge building boom at the time we could earn 3x or 4x the union rate.
the union had a strike and a march all around the country trying to stop us working on the lump. some of the union men got sent to prison over the strike including the actor ricky tomlinson who was a plasterer at the time.
in the 60s was the last time i saw a building workers union. if a site was union job you had to have a union card to be able to work on that site. you where paid the union rate which was very low. you also had to pay union subs.
we where on the lump, a lump sum for square yard. no holiday pay ,no sick pay, we negotiated our own rates. with the huge building boom at the time we could earn 3x or 4x the union rate.
the union had a strike and a march all around the country trying to stop us working on the lump. some of the union men got sent to prison over the strike including the actor ricky tomlinson who was a plasterer at the time.
£1.75 a mtr2 float and set, £1.50 a mtr2 board and set 1983 these prices, by 1985 2.00 per mtr float n set £1.75 board n set, 1990 £2.00 board n set, £2.80 dot dab n set, £ 3.00 float n set, influx of d+d in next ten years made floating a specialist job lol and it became £4.50 plus per mtr but not used all too often ,Yorkshire rates these as I have gone through them , now is better rates but not gone up with inflation , last boom I was charging wat I wanted for float and set workCheers for the info and history fella, nice to hear something different from the past.
Ricky Tomlinson well I never
All I ever hear/heard that the rates haven't changed since the 80s is this true for site work m2?
£1.75 a mtr2 float and set, £1.50 a mtr2 board and set 1983 these prices, by 1985 2.00 per mtr float n set £1.75 board n set, 1990 £2.00 board n set, £2.80 dot dab n set, £ 3.00 float n set, influx of d+d in next ten years made floating a specialist job lol and it became £4.50 plus per mtr but not used all too often ,Yorkshire rates these as I have gone through them , now is better rates but not gone up with inflation , last boom I was charging wat I wanted for float and set work
Hope you do,hate this shiiiitJust had phone call off the director off trade force(Bristol)
should be getting my money soon and a employer of trade force getting their ass kicked!!!
Do ask your grandad to post something interesting in this forum - you mean granolithic flooring ?
at one time, we would pre lay the screed onto oversite on the same day that the concrete oversite was laid. we would fit a 2x1 on to the brickwork and screed up to that. cover the screed with sand till the house was built.
hardwall/ browning, and skim is monolithic plastering.
What's 'oversite'?
So Malc, you're screed was approx. 1" thick and that was only possible as it was a 'mono' screed? (effectively, there being no joint between the layers)
The sand being to keep moisture in the screed and stop brickies sxxt marring the surface?
Just trying to understand. ;-)
Straight conventional screed @malc? No SBR slurry or modification. Or fibres?
Straight conventional screed @malc? No SBR slurry or modification. Or fibres?