Advice needed please!
My sisters shower room has had a new flooring screed put down and the guys who did it noticed some damp around the bottom of the external walls,
I have removed tiles and hacked plaster back to about 3 ft in height.
My plan is to clean the brickwork down and apply 2 coats of KA Tanking Slurry.
Then apply a coat of bonding to build out he level so that I can dot and dab a moistyre resistant plaster board from floor to ceiling.
Is it OK to use bonding over slurry?
My sisters shower room has had a new flooring screed put down and the guys who did it noticed some damp around the bottom of the external walls,
I have removed tiles and hacked plaster back to about 3 ft in height.
My plan is to clean the brickwork down and apply 2 coats of KA Tanking Slurry.
Then apply a coat of bonding to build out he level so that I can dot and dab a moistyre resistant plaster board from floor to ceiling.
Is it OK to use bonding over slurry?