stuart23
Private Member
A month or two back, I accepted a day rate plus mats as the bloke kept changing his mind on a job. Anyway, I quoted £x per day, per man plus materials. I detailed on the quote an estimate of 2 man days were required. Anyway, me and another spread smashed the job out on a Saturday, took us a full on day, think it was 3 big sets in all...about 13-14 bags plus the dubbin out etc
So, I arrive at house a few days later to collect payment and miss prim was sat in the X5 whilst mr charisma was cleaning his golf clubs in the garage. I'd told them on the phone what the bill was by text, so I was somewhat amazed that they were about 55% short. Now normally, I don't count the cash however fir some reason I did..... Then, the argument started, 'you said £x per day and you were only here for one day and my mate told me this job should only be 5 bags of plaster'....... Even though I'd given them a receipt for mats used and hadn't taken the pi55.
So, I had to pull up their quote and draw their attention to the 'per day, per man' bit which, they could not get their orange faces over.....thing is, if I'd done it on my own it'd taken me 3 days and they wouldn't have battered an eyelid.
By by the looks of their house, cars, car their teenage kid was driving they weren't short of a bob or two so why do they think I will work for peanuts?
Really boiled my sh1t..... Especially as I had to go back again to collect the rest of the cash.
Hairybear, why would you accept a day rate plus mats then smash it in one day?