Hi thier, iv had a problem with my screeds that the top never sets hard and will brush away and wilp form pits. I make my screeds 4 sharp sand to 1 opc mixed for as short as posable but mixed well and i try and get my gauging spot on . When i lay it i damping the sub sevice with watered dwn pva and compact the by jumping and tapping then float and dry trowle to finsh. I dont coer bec when i did it toke for ever to dry . People hav ssaid to me screed normaly break up on top is this true to. Thank 4 reading and for replys , sorry 4 the spelling .
Sam
Sam