I am preparing one of my bathroom walls for tiling. The problem is that the existing rendered and set wall is higher than the adjoining pb section. I started to hack off the surface of the rendered section to get it roughly level with the pb. This, however, is proving difficult as it is well attached to the wall. What i propose to do is take the minimum off to allow a coat of multi/board or one coat to level this with the pb. What would you guys recommend bearing in mind the surface is going to be rough and vary in depth. I don't want to cover the pb, just butt up to it as the tiles will cover the join. It will obviously need pva'ing before plastering, what's the recommendation these days as i haven't brought any for a while