markyyyyyy
New Member
Am applying 2 coats of tanking slurry on to a 9" solid wall, followed by dot and dab insulated plasterboard.
Cant use foam as the walll is not level/flat in many places
I also want to make my wall vertically level hence dot dab.
Do I need to apply a primer onto the dried tanking slurry before dot and dab adhesive? I need to wait a mo th before boarding as I need new doors and windows.
Thanks
Cant use foam as the walll is not level/flat in many places
I also want to make my wall vertically level hence dot dab.
Do I need to apply a primer onto the dried tanking slurry before dot and dab adhesive? I need to wait a mo th before boarding as I need new doors and windows.
Thanks