Have removed the bathroom and found several leaks were happening. which left wet render and concrete floor below the bath. Have now taken tiles off which in places has taken plaster and render and others left very stubborn adhesive. I had different depths to fill with the background being plaster, render, insulation blocks and some engineering brick.
so far have PVA two coates let this dry then use bonding coat to get a level surface.
Now on two walls, I need to Dot & dab plasterboard. My questionnaires how long do I need to leave the bonding coat before I can fix the plasterboard. Any help would be appreciated.
Thanks
so far have PVA two coates let this dry then use bonding coat to get a level surface.
Now on two walls, I need to Dot & dab plasterboard. My questionnaires how long do I need to leave the bonding coat before I can fix the plasterboard. Any help would be appreciated.
Thanks