Materials are on site already, thats why im not familiar with drying times as iv not used Enywall products before. Also going over some 1's terrible terrible Krend, cracks everywhere and uneven scrapping, i know its not needed but he's got people in painting the whole external of the block after us anyway (we are only patching 1 section) think the contractor just wants this nightmare to be over lol