Mad man you algee, makes me want to turn to drink.
You beast I’d like to see a video of you lobbing plaster on.....nakedalgees back with a vengence.....
gloryfide labourers hit... to wet to trowel again.
get them machines lined up @gps
get these floors cleaned @Vincey
soon il be as rich as @theclemo FACKING AV IT
View attachment 24766View attachment 24771View attachment 24773
View attachment 24774
That persimmons site? What m2 is in the big one? Looks about 700-800done them all ..in plot 92 now..big cuunt on the end is getting done in 4 days.....
Nick the c**t be a winner
ye charles church mate same firm really.That persimmons site? What m2 is in the big one? Looks about 700-800
You must be f**k**g mad you c**tye charles church mate same firm really.
He’s prob morphed into Andy gwhere is me old mate @scottie5 ....good crack with him.
Big refina ones can get 4 and half bags in.@Gibbo where can i get a bigger mixing bin with flat bottom mate.
Y want a 45 gallan drum u c**t@Gibbo where can i get a bigger mixing bin with flat bottom mate.
Shut up you c**tY want a 45 gallan drum u c**t
FACKING AV IT 2 andy xxY want a 45 gallan drum u c**t
No wonder you want a drink on a evening ain't plastering like groundhog Day on site looking at same s**t every day same hits no variation
Ha ha! I think we must of done sommat really bad in a previous life to be punished with this job lol.i spoke to god at the weekend mate....he sent me back to hell lol
You're going to be a long time dead at this rate mate.done them all ..in plot 92 now..big cuunt on the end is getting done in 4 days.....
Needs a f**k**g wheelie bin with a tap at the bottom.What a machine, RESPECT. That bucket full would last me a f**k**g week. haha
You're going to be a long time dead at this rate mate.
So how much gear is in that bin and how many hits of that size do you do in a day?i dont find it hard to be honest....onsite 9.30 gone 4.
taking 4 girls to the cinema soon to watch mama mia 2.
now thats hard work
So how much gear is in that bin and how many hits of that size do you do in a day?
I used to get to about 90sqm. of ceilings done a day and no one around me ever seemed to get more done than me but I must have been like a snail compared to you.