Hi Nick0412
The mix ratio is 2.5 granno 6mm chippings to dust, 0.5 sharp sand, 1 cemment.Depending where you are in the U.k. we would purchase granno from Tarmac.We grout the day before,to get a little suction,we lay first 50mm semi dry,and levelled by shovel,approx;and then furthur top with 25mm, wet mix to datum.We lay about 15 to 20sq mtr of dry before we top coat with wet mix.Top coat is tamped like concrete and then we run the float over once,and then trowel up granno approx; 4 times depending on ambiant temperature, and also what time we can sart laying.If we started laying at 7am,we would lay until about 11am,which on a warm day you could be finished by 5pm, on a cold day maybe 7.30pm.We lay youngmans over the area by fixing 4 by 2 to the wall to get a long wall edge.We never walk on the floor until the next day,not even to trowel it.Bay sizes 4 by 4 m2 unless dictated by others I hope this answers all your queries