Callummc24
New Member
Been offered a job on site, two apexes roughly 8m2 each in Weber mono, I’m fairly new to rendering but have been doing all types of internal plastering for the past 8 years. I’ve done a few weeks with some machine lads but I’m going to be hand balling on, just looking for some advice really would I be able to get both on in the same day? Should I use accelerator or not? Was thinking of mixing up in the 120l blue water barrels, will I be able to get 8m2 out of one barrel? My thinking was to mix up one barrel, first coat, serrate second coat flatten then spat in. Jump onto the next apex and repeat the same, by the time the second one is on was hoping the first would be ready to scratch. Then once finished jump onto the second and scratch. Is this right or what would you advise different?