yeah :glare:like an exhaust?
to be honest , you'd be a **** for leaving the hardwall for a weekAm I a **** if I use it a week after I hardwalled it?
I know there's really no need is there........to be honest , you'd be a **** for leaving the hardwall for a week
Never use PVA on Hardwall- ulnless it's a very diluted coat like 1 part pva to 10 parts water. If I have to skim Hardwall next day or later I give it a good soak with water out of a bucket using a 9 inch *bragging* roller. And wet yer ceiling lines/internals with your wetbrush.:RpS_thumbup:First time on the forum. Really useful space
20mm odd worth of hardwall to be slapped onto a wall. Needs to be done in two hits, done the first hit sponged & keyed it this evening. Then left to eat & have a beer. Any need to PVA tomorow morning before I do a final second hit before then slapping on some multi?
if you read the instructions on a bag of hardwall it will tell you NOT to use pva.
i would give the first coat a scratch with a scratcher, then apply the second coat
cracking thread this u get it !!:RpS_thumbsup:
Does anyone else burp all the time when you're working with hardwall?
Makes me belch :RpS_confused:
just wank on it... trowel it in.. kills all the suction