ok, so ive bought 6 bags of k rend dash receiver, and 6 bags of jura stones. The trims are all fixed and scratch coated the wall ready for top coat. My question is about timings. Should I mix 1 bag at a time, lay the render on, mix another bag, then dash the first bags worth of stuff and lay the second on etc?? What do yous think?
 
I am only doing the 1 wall, its just coz im not lightening fast with render so I would be doing it in prob 4-6 sections. Was unsure if its ok to mix a big batch up in the mixer or just go for 1 bag, lay it on, dash it, then mix another etc
 
ok, so ive bought 6 bags of k rend dash receiver, and 6 bags of jura stones. The trims are all fixed and scratch coated the wall ready for top coat. My question is about timings. Should I mix 1 bag at a time, lay the render on, mix another bag, then dash the first bags worth of stuff and lay the second on etc?? What do yous think?

Mix enough for one wall.

I am only doing the 1 wall,

:RpS_laugh:
 
The reason for saying I'm only doing the one wall is I have 6 bags of render, I don't know if it could be right to mix up them all at once, or to do them 1 at a time as I don't want the render to go off.
 
That's the wall 99 % complete, I ran out of k rend, 1/4 of a bag would finish it, does anyone know of a supplier open on a Sunday in the Glasgow area? If bit Rowebb it is on monday
 
Very happy, I'll upload a picture in a min, go easy on me guys, I'm a sparky to trade, it ain't perfect, but it's miles better than before! Will it be on the wall in a few years?? Now that s the question! :RpS_biggrin:
 
How best to prepare garage for pebble dash
 
A feckin. spark!!!!!Not bad,...... for. a sparky .:RpS_w00t:
was it better than leaving cables hangin out every box?, cables not clipped in?lop sided too deep boxes!!! And general disregard for any coont else on the job!:RpS_angry:.!!......rant over.:RpS_laugh:
 
A feckin. spark!!!!!Not bad,...... for. a sparky .:RpS_w00t:
was it better than leaving cables hangin out every box?, cables not clipped in?lop sided too deep boxes!!! And general disregard for any coont else on the job!:RpS_angry:.!!......rant over.:RpS_laugh:

Haha! Must say, we ain't the worst... That goes to joiners...especially ones on price work... Sheet sheet and more sheet, even if our conduits arnt in, oh aye... What's with the filling boxes with plaster! Haha
 
:RpS_thumbup:
Haha! Must say, we ain't the worst... That goes to joiners...especially ones on price work... Sheet sheet and more sheet, even if our conduits arnt in, oh aye... What's with the filling boxes with plaster! Haha
Filling boxes with plaster is retaliation ..:RpS_thumbup:
for the Shiite you's leave behind!!!!':RpS_laugh:
 
:RpS_thumbup:
Filling boxes with plaster is retaliation ..:RpS_thumbup:
for the Shiite you's leave behind!!!!':RpS_laugh:

Must admit , not had much dealings with plasterers on site, mostly painter decorators with joint filler, messiest on site has to be stone masons, Jesus!
 
Haha! Must say, we ain't the worst... That goes to joiners...especially ones on price work... Sheet sheet and more sheet, even if our conduits arnt in, oh aye... What's with the filling boxes with plaster! Haha

Its called hide the cables game....................:RpS_thumbup:
 