mathematical equation mr clemo.
square meterage, times by the depth will give you the cubic meterage. there is 0.6 meters in a tonne, and 1.6 tones in a meter, give or take.
so 70m, times 15mm or 0.015 = 1.05 cubic meters. times by 1.6 = 1.68 tonnes. allow 6 bags of cement per tonnes.
remember to allow for wastage