You robbony cunte.
Och, i got a spot on my cock, what can the matter bee.
I'd be double that price at least. Ask the plasterer to price some easy fill into the job, u'll need it when it drys out.
Just because someone's price is lower than you does not mean that their finish will be any different to your's.
Everybody wants skilled tradesmen to work for f**k all, quoted a lot of jobs lately and went in at reasonable rate as not to rob anybody and still not got them, Might as well go and stack shelves do at Aldi, for the same kind of money people want to pay.
If a gas fitter turns up to look at a boiler he can charge what he wants, we have to graft in this game and try and justify what we're charging. As for working for builders on extensions by the time it gets to plastering stage moneys getting tight, so plasterer gets squeezed.
Tough game to be in, I knew I should have become a porn star!!!!! LOL
I've priced 2 jobs at 150 a day in my pocket and haven't answered the phone when they rung back I don't want to sound arrogant etc but I still cant be ****** to put my tools on get them off etc put dust sheets down blah blah I'd rather stay at home skint and do site work
iv just done a little job in london. we were there for about a week. ended up due to some balls ups that we earnt less than 200 a day. bearing in mind 2 hrs each way driving. i couldve skimmed a couple of lids 5 mins from home for one and half in the hand. shouldnt always over look it
iv just done a little job in london. we were there for about a week. ended up due to some balls ups that we earnt less than 200 a day. bearing in mind 2 hrs each way driving. i couldve skimmed a couple of lids 5 mins from home for one and half in the hand. shouldnt always over look it
where abouts in kent are u?
well as of next yr i shall not be able to afford london due to the low emmisions woo hoo
**** there are some lazy expensive plasterers on this forum....